M10 Threaded Bar: How Many Metre Lengths for Eight Kits?

Eight kits need eight metres of finished studs, but twelve one-metre bars. See the cut list, the saw allowance and which offcuts are worth keeping.

By JJ Building Materials
8 min read

Close-up of the continuous external thread on bright zinc plated studding

Eight workshop kits each need one 510 mm stud and one 490 mm stud. Add them up and you get exactly eight metres of M10 threaded bar. Put eight one-metre lengths in the basket, though, and the workshop will run short. The two pieces add up to the whole length of a bar before the saw has removed any material. For this cut list, the order comes to twelve one-metre bars.

Here is the stock calculation behind that decision, including what happens to the four metres that appear to be left over. You can use it to price another batch by substituting the finished dimensions and cutting allowances from your own workshop. It assumes the fixing specification has already been agreed. The question for the buyer is how much of that specified stock to purchase.

What does one unit of M10 studding buy?

On the JJ listing for M10 threaded bar, select M10 from the diameter options. The stock length is one metre and the M10 product code is 170693. The adjacent M8 and M12 options are also one metre long, but have different threads and different codes. A basket quantity of eight against the M10 variant therefore buys eight individual stock lengths. It does not buy a continuous eight-metre length that can be divided wherever the cutting plan happens to need a break.

The listing calls the product BZP Studding. BZP stands for bright zinc plated, while studding describes the continuously threaded, headless form of the metal. Samac’s studding schedule likewise lists M10 × 1 metre as a single item. Keep both the diameter and the stock length visible on the quote. If someone prices a different length of M10 threaded rod, the number of usable pieces per purchased unit can change even though the diameter on the delivery note is correct.

Before doing the sums, ask the workshop which dimension it has given you. A finished stud length is the distance between its two finished ends. A spacer length, the gap between two plates or a dimension between nut faces measures something else. If the parts list gives 510 mm as the finished length, enter 510 mm once. If all you have is a 510 mm gap on an assembly drawing, get the finished part dimension confirmed. Adding an assumed amount at each end can create an expensive error when a whole batch sits close to the half-metre mark.

Put a saw cut into the arithmetic

Cutting a piece out of a bar removes a strip of material known as the kerf. For this worked order the workshop budgets 3 mm of stock per piece separated from the bar. It expects to use the supplied starting end and has confirmed that its finishing process fits within the quoted allowance. Those are estimating assumptions for this particular exercise. For a real job, use the workshop’s figure for its equipment and any extra end trimming, and check the usable stock length if a layout leaves very little margin.

Try a single kit on a one-metre line on paper. The first finished stud takes 510 mm. After a 3 mm cut, the longest remaining piece is 487 mm. You need 490 mm. Starting at the other end with the short part changes nothing: 490 mm plus the same cut leaves 507 mm for a 510 mm part. Even one separating cut prevents the pair fitting. You can spot the problem without knowing anything about the other seven kits.

Now group the parts by length. Each 510 mm stud needs its own bar because two long ones add up to 1,020 mm even before the cut. Eight long studs therefore account for eight bars, and none of their remainders is long enough for a 490 mm stud. The eight short studs can be paired. Two short pieces use 980 mm of finished metal and the two 3 mm allowances take the total to 986 mm. Four more stock lengths complete the order.

Stock allocation Finished pieces per metre Metre bars Remainder per bar
Long studs 1 × 510 mm 8 487 mm
Short studs 2 × 490 mm 4 14 mm

The same calculation explains the apparent waste. The order contains twelve metres of bar and the finished parts total eight metres. Sixteen cuts at 3 mm consume 48 mm. The rest is eight separate 487 mm lengths and four 14 mm ends, or 3,952 mm altogether. The 487 mm lengths might be worth keeping for another drawing. None supplies the missing 490 mm part. Crediting their total length against the present order would give the buyer a saving that the workshop cannot realise.

Select a one-metre studding size

When a shorter part genuinely changes the quote

Suppose a second customer has a different approved design. Their long stud is still 510 mm, but their short stud is 470 mm. Now one bar can supply a complete pair. Allow 510 + 470 + 3 + 3 = 986 mm for each kit, leaving 14 mm from the metre. Eight kits take eight bars and the offcuts are all short. That result belongs on the second customer’s quote. The first customer’s eight 490 mm parts have to stay at the length on their drawing.

There is another opportunity if the workshop is making both orders together. Cut the eight 510 mm parts for the first order and earmark the eight 487 mm remainders for the second order’s 470 mm parts. From each remainder, a 470 mm part and a 3 mm cut leave 14 mm. You still need to buy stock for the second order’s long parts. Draw the combined list before promising a saving: both sets of eight long pieces need sixteen separate parent bars and the first order’s short pieces still need four more. That is twenty bars across both jobs, exactly the same as pricing twelve plus eight separately. Moving a useful offcut from one job sheet to the other does not of itself reduce the number of bars purchased.

A genuine saving arises if a separate job needs only eight 470 mm pieces and has no long pieces of its own. Ordinarily it would use four one-metre bars, two short lengths per bar. If the first customer’s eight remainders are available to use, the workshop can supply that second list from them without opening another bar. Write the number, usable length and ownership of the offcuts beside the quote. That prevents the same pieces being promised to another fitter while they still appear as free stock on the shelf.

Count the mating hardware separately

For an assembly that specifies one plain nut at each end of every stud, start from the sixteen finished studs in the first order. They require 32 nuts. JJ lists Samac M10 hex nuts in boxes of 100, with M10 under SKU 170664. If this is the nut approved for the job and you have none in stores, the order is one box. Issue four nuts with each two-stud kit. The 68 left in stores then have a clear explanation on the materials sheet. Washers, where shown, need their own quantity and specification.

A different detail may show a head at one end of a much shorter fixing. JJ’s M10 hex head set screws are a separate product supplied in boxes of 100, with options including 50 mm under SKU 170553 and 100 mm under SKU 170555. That is useful when a workshop order also includes a headed component. It does not turn a 100 mm screw into a source for a 510 mm headless stud. Separate those lines before comparing a price per box with a price per metre.

The thread diameter alone cannot approve a change of hardware. Keep the pitch, material or property class, finish and nut type required by the job with the parts list. The letters BZP identify a finish and do not state a load capacity. If any of those details is missing on a proposed alternative, ask the supplier to identify the exact item before releasing the purchase. Our guide to matching threaded bar, set screws and nuts covers the component checks. If the drawing specifies a nylon-insert nut, use the nyloc nut identification guide before ordering that line.

Questions that come up at the trade counter

Can I order by adding a percentage for waste?

A percentage is convenient for a first budget but does not describe the pieces you need. Ten per cent on the eight metres of finished parts in our first order gives 8.8 metres. Rounding to nine one-metre bars still leaves you three bars short. A two-column list of finished lengths and quantities takes little longer to prepare. It also gives the merchant enough information to see why a quote for twelve units is correct even though the drawing contains only eight metres of finished metal.

What if I already have some M10 threaded rod in the workshop?

Measure each usable remainder individually and check its identity against the job specification. Write down its length before assigning it to a finished piece and allow for the cut. A 500 mm remainder of the agreed stock can supply a 490 mm part with the example allowance. A 487 mm remainder cannot. Two 500 mm remainders could therefore displace the one new bar otherwise allocated to two short parts. One such remainder alone still leaves an odd short piece to source, so recalculate the complete order before reducing the basket.

How do I allow for spare parts without buying too many bars?

Ask whether the customer wants spare finished studs or uncut stock. One spare 510 mm piece and one spare 490 mm piece require separate parent lengths under the original layout, unless suitable stock is already available. One uncut metre is more flexible for a later repair but cannot provide both those spares. Name the intended spare on the quote. The customer can then choose whether they want a ready-to-issue replacement for each length or a bar to hold in the workshop.

What should the merchant and workshop each receive?

Send the merchant a line for twelve individual one-metre lengths of M10 BZP studding, SKU 170693, plus the separately approved hardware. Give the workshop the cutting schedule showing eight bars for singles and four for pairs. At handover, count eight kits containing one long and one short stud each. Keep the 487 mm remainders together with their specification and actual measured lengths. That gives the next buyer something they can allocate with confidence, and explains every metre of the original order. Browse the fixings and fasteners range for the separate order lines.