How many bricks on a pallet? Five UK facing brick packs compared
A bricklayer’s list gives you a number of bricks. The merchant sells them by the pack. Compare five real pack sizes and see what it takes to order 1,008 facing bricks.
There’s no standard number of UK house bricks on a pallet. Among the facing bricks we sell, a pack of Forterra Brecken Grey contains 390 bricks, while a pack of Wienerberger Hampstead Yellow contains 680. Even two yellow facing bricks from the same manufacturer can arrive in quite different quantities. The number to order against is the pack size on the listing for your exact brick.
That difference matters when a bricklayer gives you a figure such as 1,008 bricks for an extension. Two packs of 504 cover the order exactly. Two packs of 500 leave you eight short. Here’s how to read the listing, check what a quote buys and avoid ordering another full pack for the last few courses.
Browse facing bricks by pack size
Five UK facing brick packs compared
These are individual products from the JJ range. The middle column is the quantity you buy when you add one pack to your basket. The last column shows what happens when you enter a quantity of two. Select a product name to check its finish, current price and estimated delivery.
| Facing brick | One pack | Two packs |
|---|---|---|
| Forterra LBC Brecken Grey | 390 | 780 |
| Forterra Chelsea Smoked Red | 495 | 990 |
| Ibstock Tradesman Light | 500 | 1,000 |
| Wienerberger Kemsley Yellow | 504 | 1,008 |
| Wienerberger Hampstead Yellow | 680 | 1,360 |
Look at the two Wienerberger yellows. Ordering two packs of Hampstead gives you 352 more bricks than ordering two packs of Kemsley. The finish differs too. Kemsley is a yellow wirecut, while Hampstead’s yellow stock bricks have buff tones and more variation across the face. If one has been approved against a sample, keep its name and product code on the order. “Two packs of yellow bricks” leaves too much open to interpretation.
What does the merchant mean by a pallet?
On a quote, a pack is a stated number of bricks. A pallet is what the carrier handles. People on site often use the words interchangeably. That’s fine when everyone is discussing the same product and load, but it can cause confusion when you compare a merchant’s quote with a delivery note. Use the pack quantity to cost the job. Get the number and weight of delivery units separately if you are arranging access or unloading.
Suppose your builder texts, “Order two pallets of the red.” Before paying, send back the actual description and total, for example, “Two packs of Chelsea Smoked Red, 495 in each, 990 bricks altogether.” That short reply checks the colour, the product and the arithmetic. It also gives the person receiving the delivery something more useful to check than the number of wrapped stacks on the vehicle.
Turn your bricklayer’s quantity into an order
Start with the number of individual bricks the job needs. Ask whoever prepared the quantity whether it includes cuts, breakages, returns at openings and any bricks being kept as spares. A list headed “960 facing bricks” could be a count straight from the drawing or a final buying quantity. Adding an allowance twice can be just as expensive as forgetting it, especially when the total sits close to a pack boundary.
If the starting point is a wall area, establish what that area includes. A window opening removes brickwork from the face, but the sides of a recessed opening may still need bricks. A pier or a second leaf in facing brick also changes the count. For help checking brick dimensions and typical coverage before the builder signs off the quantity, use our guide to UK facing brick sizes and bricks per square metre.
A worked order for 1,008 facing bricks
Imagine the bricklayer has counted 960 bricks and asked you to add 5% for this particular job. That gives 48 extra bricks and a buying quantity of 1,008. The 5% is an example agreed for this order. A plain run of wall and a design with lots of short panels and cuts need their own allowances.
Whole packs to order = required bricks ÷ bricks per pack, rounded up. With Kemsley Yellow, 1,008 divided by 504 is exactly two. With Tradesman Light, two packs supply 1,000. If the product is being sold in full packs only, the next whole-pack order is three, supplying 1,500. That leaves 492 above the agreed buying quantity. The eight-brick shortfall is a good reason to ask about a split quantity before committing to the third pack.
If the job calls for grey facing bricks and your builder has specified Brecken Grey, two packs give you 780 bricks. Three give you 1,170, leaving 162 above the target. That surplus may be useful if there is a later phase using the same approved brick. If this is a one-off extension and space is tight, it belongs in the buying decision alongside the price and finish.
Ordering for a job in two phases
Suppose you’ve chosen Forterra Chelsea Smoked Red for both phases. The main build needs 620 of these red facing bricks and a later wall needs another 260. Both figures already include the allowances agreed with the builder. Priced separately in full packs of 495, the first phase takes two packs and the second appears to take one. Across the whole job, two packs supply 990 bricks against a combined requirement of 880. Even after the first phase, there are 370 left for the second.
That saving depends on the second wall going ahead in the same brick and on having somewhere suitable to keep the balance. Ask for the cost of a single delivery and of deliveries in stages. If access will change once the extension is built, agree where the second phase’s bricks can go before accepting the first load.
Compare what the job will cost, including the spare bricks
A price per pack is useful once you know the quantity inside it. To compare two offers for the same brick, divide the pack price by its count. Multiply the answer by 1,000 if the builder’s quotation uses a rate per thousand. Use the same VAT basis on both quotes and compare the same product code, size and finish. A rate per thousand is a way of expressing a price. It doesn’t tell you the merchant will supply exactly 1,000 loose bricks.
For the figure you will actually pay, multiply the price by the whole packs you intend to buy, then add the delivery charge for the site postcode. A quote with a cheaper individual brick can still cost more overall if it includes a full extra pack or a second delivery. If one merchant offers a split pack, ask for the delivered total for that exact quantity. Multiplying a full-pack unit rate by the number of loose bricks can give a misleading answer.
Keep the two figures on your worksheet under separate headings, “bricks required” and “bricks supplied”. If your buying quantity already includes 48 for cuts and breakages, the 162 left over in the Brecken Grey example are additional to that allowance. Keeping those numbers separate makes it easier to explain a quote to a customer or agree who keeps the surplus at the end of the job.
Get the delivery right first time
Give the merchant the postcode where the bricks will be unloaded. Mention a narrow approach, parked cars, a sloping drive or a gravel surface when asking for the quote. JJ’s pallet delivery policy calls for hard, flat ground and safe kerbside access. A pallet truck cannot take the load across gravel, grass or steps. If the only space you have in mind is behind the house, agree a workable drop point before arranging labour around the delivery.
Check pallet delivery and access
Give the person taking delivery a copy of the order with the product name, code, pack count and total number of bricks. Ask them to check the pack labels and photograph the labels and any visible damage while the load is still identifiable. If a label or quantity differs, check it with the supplier before laying the bricks. Keep the label details until the job is complete. They are particularly valuable if you need to trace a batch or discuss a later top-up.
Questions about buying a pallet of bricks
Can I buy fewer bricks than a full pack?
Ask about the named product and give the exact number you need. A listing described as a pack of 495 is priced and sold in that quantity online. Entering “20” in the quantity box on that listing means 20 packs. For a repair, a shortfall or a small garden wall, ask whether a smaller quantity can be supplied and what it would cost delivered before placing the online order.
How many square metres will one pack cover?
If your builder is working to 60 bricks per square metre for a single face, a pack of 390 covers about 6.5 m² and a pack of 504 about 8.4 m², before cuts or breakages. Use those figures only where the brick size, joint and bond suit that rate. For a wall with two visible faces, ask which faces the builder has included before doubling a quantity yourself.
Can I tell how much a pallet weighs from the brick count?
The count alone won’t give you the loaded weight. Ask for the gross weight and footprint of the packed delivery unit for your product. A figure described as “dry weight per brick” is for an individual unit. Multiplying that figure by the count leaves out packaging and may differ from what the carrier is actually delivering. Pass the supplier’s packed figures to whoever is responsible for receiving the load.
What if my order includes two different facing bricks?
Calculate each one separately. For example, a contrasting panel might need 80 dark bricks while the main elevation needs 900 yellow ones. Adding them to make 980, then ordering two packs of 500 yellow bricks, leaves you without a single brick for the panel. Put each colour and any special shapes on their own line, with a quantity and product code against each.
What details should I send for a brick quote?
Send the product link or code, the number of individual bricks your builder has allowed, the delivery postcode and any access restrictions. Say whether the quantity is for the entire job or the first phase. If you are only a few bricks over a full-pack boundary, give both numbers. We can then check the available quantities and delivery options against the job you are actually buying for.
One line to put on the order
For the worked example above, the order line would read “Wienerberger Kemsley Yellow, JJ code 161702, 2 packs of 504, 1,008 facing bricks in total.” Add the site postcode and delivery contact underneath. Your builder, the merchant and the person signing for the load then have the same figures in front of them.