An accurate dry verge order is a list of components for identified roof edges, not simply a length of plastic trim. The repeating units, eaves starters and ridge end pieces need separate quantities. This guide explains how to organise an Ambi-Verge schedule so the supplier and roofer can check the same information before materials arrive.


By JJ Building Materials
8 min read

Dry Verge Quantities: Units, Starters and Apex Components - JJ Building Materials

An accurate dry verge order is a list of components for identified roof edges, not simply a length of plastic trim. The repeating units, eaves starters and ridge end pieces need separate quantities. This guide explains how to organise an Ambi-Verge schedule so the supplier and roofer can check the same information before materials arrive.

Label every sloping run on the roof sketch

Begin with a simple sketch of the roof and give each relevant verge run a label. A straightforward gable has two sloping edges at that end, but a house with extensions, porches or intersecting roof sections may have more details to consider. Avoid writing only “front and back” if those words could refer to different elevations for different people. Clear labels such as a drawing reference or an agreed elevation name reduce ambiguity.

Have the roofer confirm which runs will receive the proposed system. Some edges may be treated differently, and an existing detail should not be included merely because it looks similar from the ground. Mark any excluded areas explicitly. This stops a full-roof estimate being mistaken for a partial repair order, or a small repair quantity being assumed sufficient for a complete gable.

Use the dry verge collection to identify the available component types, then build the schedule around the actual roof. Keep the roof sketch with the quotation rather than leaving it in a separate message thread. If the scope changes, revise both together so the product quantities remain connected to the work that has been agreed.

Count the relevant tile courses, not the unit's overall length

Timloc's ordering guidance uses one verge unit for each roof tile in the sloping run. Ask the roofer to establish the relevant course count for every labelled run. Do not divide the sloping roof length by the moulded unit's overall dimension and assume the result is the required count. The way components overlap and align with the tiles means overall product length is not a simple installed-coverage measurement.

Where the roof is still at design stage, the tile layout and course count need to be settled through the roofing specification. A preliminary count should be marked as an estimate until checked against that layout. On an existing roof, ask the roofer to verify the count as part of the survey. There is no need for the homeowner to undertake a roof inspection just to produce an ordering number.

Keep each run's count visible before adding them together. For example, an illustrative schedule with four runs of eighteen relevant courses gives seventy-two main units before any separately agreed spare allowance. That example explains the arithmetic only; it does not establish the count for a particular house. The real schedule should use the verified roof layout and the current system guidance.

Add starters as their own order line

The Timloc Ambi-Verge eaves starter is a separate component at the beginning of the sloping run. In the manufacturer's system guidance, each run needs its starter. A schedule that includes only the repeating units is therefore incomplete. Record the starter quantity against the labelled runs and check it again if the project scope changes from one elevation to several.

Do not assume starters are included in a main-unit order unless the retailer explicitly confirms a supplied kit containing them. The manufacturer's packaging quantities and a retailer's selling unit may differ, so check exactly what adding one item to the order means. Use descriptions such as “four starter pieces required” before converting the requirement into the supplied pack or individual quantity.

Timloc Ambi-Verge Eaves Starter
Timloc Ambi-Verge Eaves Starter — confirm the specified system, component shape and colour.

Count apex components separately from sloping runs

The ridge termination is a different detail from the lower start of each verge. Ask the roofer to identify the relevant apex locations and the required cap shape. Do not automatically order one cap for every sloping run without checking the arrangement. Two runs may meet at one apex, and more complex roofs need their own detail rather than a multiplication rule borrowed from a simple gable.

The Timloc round ridge end component and Timloc angled ridge end component are distinct options. Their quantities should be listed under the selected shape, not combined into an unspecified total of “ridge parts”. If the roof has more than one ridge profile, show which component belongs at each location. A photograph or drawing reference attached to that line can help prevent confusion during ordering and delivery.

For a simple illustrative gable-end schedule, two sloping runs might lead to two starters and one specified apex cap. Have the roofer confirm the actual arrangement rather than treating that example as a universal rule. Dormers, lower roofs and other junctions can change the component schedule, and the roof drawing should remain the source of the quantity decision.

Timloc Dry Verge Profiled Tile Round Ridge
Timloc Dry Verge Profiled Tile Round Ridge — confirm the specified system, component shape and colour.

Include the specified fixing arrangement

Ask the roofer to identify the required fixings and whether the manufacturer's optional batten bracket is part of the chosen detail. “Optional” in a catalogue does not mean a buyer should remove it from a specified installation simply to reduce the order total. The fixing approach should be selected for the actual roof construction and retained consistently through the quotation, material list and installation instructions.

If a bracket is specified, confirm its exact reference and quantity with the supplier. Do not replace a system bracket with a similar-looking general metal fitting. Likewise, avoid selecting fasteners solely because they fit through a visible hole in a photograph. The correct type and application belong in the roofer's specification and the current manufacturer guidance, not in an improvised shopping decision.

The broader dry fix roofing collection can help locate related products once the requirement is known. Keep them on separate lines with their exact identities. A broad label such as “fixing accessories” makes it difficult to establish whether all necessary parts are included and whether an alternative supplied later is actually equivalent.

Apply the selected colour to every component

The current JJ listings offer Grey, Terracotta, Brown and Black variants across the main components. Record the chosen colour against each line, even when the whole roof is intended to match. This is particularly useful when different people order the starters and the finishing pieces. A product link may open with a default selection that differs from the intended colour, so check the variant in the basket and order confirmation.

If the design deliberately uses different colours, explain the locations on the roof sketch. Do not rely on a supplier to infer the intended combination from an assortment of quantities. For repair work, agree whether the new part's appearance is acceptable beside weathered existing material. Colour matching is a separate decision from confirming that the replacement belongs to the correct system.

Timloc Dry Verge Profiled Tile Angled Ridge
Timloc Dry Verge Profiled Tile Angled Ridge — confirm the specified system, component shape and colour.

Distinguish manufacturer packs from retail quantities

Manufacturer datasheets often list trade packaging quantities. Those figures do not automatically describe the unit sold on a retailer's product page. Before submitting the order, confirm whether each line is priced and supplied individually or as a pack. Keep both the physical-piece requirement and the purchased quantity in the schedule so the conversion is visible and can be checked.

For example, a requirement for six components should remain recorded as six physical pieces even if the supplier offers them in a different pack size. The final purchase quantity then depends on the confirmed selling unit and any split-pack arrangement. Do not assume that a quantity of six in a basket means six pieces if the listing is explicitly for packs. Resolve that distinction before comparing totals from different suppliers.

If the project includes replacement ridge tiles as well as verge caps, consult the ridge tiles and fittings range using the roofer's specification. Keep those tiles separate from the dry verge end caps in the order. Similar words in their names do not make them the same component or give them the same quantity basis.

Check the order against the delivery

Arrange for the delivered parts to be checked before the roofer needs them on the roof. Compare product identities, colours and physical quantities with the schedule and supplied paperwork. Report discrepancies through the supplier's process promptly. A missing starter or wrong cap shape can delay work even when the main-unit count is correct, so do not focus only on the largest item total.

Retain the final schedule with the installation records. Note any approved substitution or quantity change rather than leaving the original document as though nothing changed. This record will help if a local repair is needed later and makes it easier to identify the correct product family. Keep any agreed spare components labelled and stored appropriately so they remain useful.

Frequently asked questions

Can I calculate units by dividing verge length by product length?

Use the manufacturer's course-based ordering guidance and the verified roof layout. Overall moulded length is not a simple installed-coverage measurement. Ask the roofer to confirm the count for each sloping run before converting the total into the retailer's selling unit.

How many eaves starters do I need?

Timloc's guidance calls for a starter at the beginning of each sloping run. Identify the runs included in the work and have the roofer confirm the schedule. Do not assume starters arrive automatically with separately ordered main units.

Is a ridge cap needed for each verge run?

Count the specified apex details separately. Two runs may meet at one apex, while other roof arrangements require their own assessment. Ask the roofer to identify the location and shape of each cap rather than applying a blanket one-per-run rule.

Should I include optional brackets in the order?

Include them where they form part of the selected installation detail. The roofer should decide the appropriate fixing arrangement for the roof and current guidance. Do not omit a specified component or replace it with an unrelated fitting without approval of the revised detail.

Are manufacturer pack quantities the same as retail quantities?

Not necessarily. Confirm whether the retailer supplies each component individually or in packs. Record the physical-piece requirement and the purchased quantity separately so the order can be checked without ambiguity.

What is the quickest final check before ordering?

Compare the labelled roof runs, course counts, starters, cap shapes, colours and specified fixings against the quotation. Then verify the selling unit for every line. A complete component schedule is more reliable than checking only the total number of main verge units.

Use the agreed schedule to select the components from the collection, keeping their exact names and colour variants attached to the order.