15mm Pipe Insulation: Will a 9mm or 13mm Wall Fit?
A 15 mm copper pipe with 11 mm of clear space behind it presents a surprisingly precise buying decision. A sleeve with a 9 mm foam wall leaves a nominal 2 mm behind the pipe. A sleeve with a 13 mm wall needs more space than you have. Both products say “15 mm” on the label. If the job calls for 13 mm insulation, finding that pinch point while you can still change the boxing is considerably easier than finding it with a delivery of foam on the floor.
The six Tubolit options on the JJ listing are sold in one-metre lengths. To choose between them, take three measurements on the actual route: the outside diameter of the bare pipe, the smallest clear gap around it and the lengths of the individual sections you intend to cover. Here is how those figures translate into a basket, including a utility-room example where adding all the metres together gives the wrong answer.
Read the two dimensions on the sleeve
Look straight at the open end in the photograph. The hole in the middle fits over the pipe. The ring of grey foam surrounding it has a thickness of its own. On the 15 mm pipe lagging with a 9 mm wall, the first figure refers to the outside diameter of pipe the sleeve is intended to fit. The second describes the depth of foam from the pipe surface to the outside of the sleeve. The length along the pipe is a separate measurement again.
Allow for foam on both sides when calculating the space across a finished run. A 15 mm pipe with 9 mm on either side occupies about 33 mm across. Move up to 13 mm of foam and the finished diameter becomes about 41 mm. That change adds only 4 mm on the side facing the wall, but it adds 8 mm across an opening that has to accommodate the whole sleeve. Those are nominal dimensions for planning. A gap exactly equal to the calculated diameter gives no working allowance.
| Bare pipe outside diameter | With 9 mm foam | With 13 mm foam |
|---|---|---|
| 15 mm | 33 mm across | 41 mm across |
| 22 mm | 40 mm across | 48 mm across |
| 28 mm | 46 mm across | 54 mm across |
In the 15 mm pipe insulation with a 13 mm wall, the central hole is the same size as in the 9 mm option. Buying the next bore up gives you a different hole. It does not give the original pipe a thicker, close-fitting layer. If the quotation simply says “15 mm lagging”, ask for the missing wall thickness before comparing totals from two suppliers.
Measure the pipe where it runs straight
Use an accessible, bare, cool section away from a joint. With callipers, measure across the outside of the tube. A compression nut, a painted boxing cover and a plastic pipe clip can all be wider than the pipe they surround. If the easiest item to reach is a fitting, move along the same uninterrupted pipe until you can measure the tube itself. If the route passes through a reducer, start a new line on your notes for the section beyond it. Our guide to copper pipe and reducer sizes shows why two sizes can appear on the same fitting.
A narrow strip of paper can help where you can reach around the tube but cannot get callipers squarely across it. Wrap it once round the bare pipe, mark where the edges meet, then measure the paper flat. You have measured circumference. Divide by approximately 3.14 to estimate diameter. About 47 mm around suggests a 15 mm outside diameter, about 69 mm suggests 22 mm, and about 88 mm suggests 28 mm. A paper measurement over existing insulation tells you the size of the covering. It cannot reliably identify the pipe inside.
You may have two lines side by side for most of their length and only one in clear view near a cupboard door. Mark them separately even if they appear identical. A photograph with a small label showing where each measurement was taken is more useful at the merchant’s counter than a close-up of two anonymous copper ends. If the measurement falls between sizes, repeat it on another exposed straight section before choosing a variant.
Will it fit behind the pipe and between neighbouring runs?
Measure the clear distance from the nearest surface of the bare pipe to the finished wall, shelf, back panel or other obstruction. Check at several points. In a utility cupboard the limiting point may be a short return where the pipe crosses the edge of a shelf. The larger uninterrupted area above it can give an optimistic measurement. Include any lining or removable panel still to be fitted. A 6 mm back panel changes an apparent 17 mm gap into an 11 mm one.
For two parallel pipes, the gap between their outer surfaces has to accommodate both facing layers of foam. Suppose the bare pipes have a clear gap of 23 mm. Two 9 mm walls occupy 18 mm of it, leaving a nominal 5 mm. One 9 mm and one 13 mm occupy 22 mm and leave just 1 mm. Two 13 mm walls need 26 mm before allowing room for access. Record measurements as surface-to-surface gaps so nobody later reads a centre-to-centre dimension as free space. At bends and crossovers, take another measurement where the two routes come closest.
The comparison answers a question about fit. Choosing the required insulation thickness also depends on the service, location and project specification. If the installer has specified a greater thickness than the route allows, raise the clash while the panel or route can still be reconsidered. Packing the foam tightly behind a panel defeats the purpose of specifying its full thickness. The Energy Saving Trust’s guidance on insulating pipes and tanks is a starting point for household energy improvements. For a specified installation, keep the designer’s requirement against the individual pipe run on your order.
A utility-room order with two pipe sizes
Imagine a plumber has marked four separate straight sections of a 15 mm hot-water run for 13 mm wall insulation. They measure 0.72 m, 0.68 m, 0.64 m and 0.61 m. A separate 22 mm run needs two pieces, 0.55 m and 0.42 m, with a specified 9 mm wall. For this example the site measurements allow both wall thicknesses, the fittings have been dealt with separately and the customer wants a single uninterrupted piece on each marked straight. That last detail affects the order more than any percentage allowance.
Start with the four pieces of 15 mm bore. They total 2.65 m, which rounds up to three one-metre lengths on an area-style estimate. Try putting the two shortest pieces on a single length: 0.64 m plus 0.61 m already comes to 1.25 m. None of the four pairs can be cut from a metre. Order four lengths of the 15 × 13 mm option, JJ SKU 145489. There will be 1.35 m left in several pieces before trimming. That remainder is useful for a future short run of the same size, but it cannot make any of the four long pieces whole.
Now look at the two larger-bore pieces. They total 0.97 m, leaving 30 mm on a metre for the two cuts and any small trimming adjustments. Subject to confirming those finished lengths, one length of 22 mm pipe insulation with a 9 mm wall, JJ SKU 145487, covers both. The order is five lengths on two basket lines. Adding all six measurements first gives 3.62 m and suggests buying four lengths. Even if four metres of loose foam were enough in total, the bore sizes and unbroken pieces rule out that order.
If the layout changes, revisit the cuts before adding another metre. Suppose the 0.72 m piece becomes two independently measured sections of 0.36 m either side of a fitting. One 0.36 m piece can then share a metre with the 0.61 m section. The other could theoretically share with the 0.64 m section, but that leaves no trimming margin. Measure again before relying on that exact pairing. This is the sort of small decision a sketch preserves and a blanket extra ten per cent misses.
Where straight lengths stop being a useful measure
On an existing route, mark the ends of each straight you measured and identify the valve, tee or bend beyond it. A sleeve sized for the pipe may be too small to enclose the larger body of a fitting. Equally, a metre measured round the route with a flexible tape may include a valve handle that must remain accessible. Keep a separate list of those details for the installer. Our guide to elbows, tees and crossovers can help you put names to the fittings on a sketch.
On a new run, ask whether the stated dimension is a drawing length, a cut length of copper or the exposed length that will receive foam. They can differ. For example, a dimension to the centre of a tee includes part of its body. Mark an allowance for the fitting separately instead of logging that entire distance as a straight piece of insulation. When a plumber supplies the fittings and you supply the insulation, agreeing that boundary before ordering helps both of you see what still needs covering.
If you are matching an earlier purchase, take the full size and length from the label. Armacell publishes technical information for its Tubolit DG range. Check the precise product designation when a specification calls for a particular system. A familiar family name or similar grey finish does not establish that a particular sleeve has the required performance. The calculations above use JJ’s one-metre sales unit. A quote from another range may use a different length even where the first two numbers agree.
Questions to settle before checkout
Is a measurement of 15 mm across the old foam enough?
No. The useful measurement is the outside of the bare tube, or a reliable marking identifying that tube. Do not cut into unfamiliar old lagging to find out. If asbestos is suspected, leave the material undisturbed and arrange professional assessment. The HSE guidance on asbestos work specifically identifies work that can disturb asbestos pipe lagging. Use another exposed point on the same confirmed pipe or the installation records for the initial enquiry.
Can I buy the thinner foam if that is all the cupboard will take?
First establish whether the thicker wall was specified for the job. If the choice is still open, give the installer the diameter, location and tightest measured clearance so they can choose an appropriate product. If the thickness is fixed, note exactly which length of the route causes the problem. A clash over a short shelf edge needs a different discussion from a pipe sitting too close to a wall for its entire length.
How do I check a mixed order when it arrives?
Sort the sleeves by both bore and wall thickness before cutting or distributing them. Two one-metre lengths can look similar side by side. Keep the product label with each group and mark the section lengths against the appropriate group on the drawing. Start by allocating the longest uninterrupted pieces. Set aside and label useful offcuts as you go so a leftover for a 22 mm pipe does not end up on the list of material available for a 15 mm branch.
For the utility-room example, the note to send with the order is short enough to read back over the phone: four one-metre lengths of 15 × 13 mm and one one-metre length of 22 × 9 mm. The pipe measurement selects the bore, the specification selects the foam wall and the cutting list selects the quantity. Keep those three figures together when you choose your Tubolit sleeve size and the basket will reflect what can actually be cut and fitted on site.